High Quality Tactical Solutions
Mining Operations
Our mine planning and delivery methods have been evaluated, tested and refined over time to offer mine owners greater confidence and productivity with low risk. We are committed to maintaining industry leadership through reliability, high productivity and problem solving with smart solutions.
- Equity participation and financing
- Excavation, hauling and stockpiling
- In-house mine planning
- Mine development
- Mine management
- Mine operation
- Mine rehabilitation
- Open cut mining
- Overburden removal
Infrastructure
Tranportation
Barge Capacity: 270-300 Feet
Loading Capacity: 1200 -1500MT / Jam
Road
Hauling Road along 60 KM to Jetty PT. Hasnur consists of the road segments traversed including:
The PT. Electra Global area along 1.4 KM
The PT. Parwata Rimba along 10.2 KM
The PT. Sindo Lumber along 8.9 KM
The PT. Palopo Indah Raya along 9.8 KM
The PT. Hasnur Jaya Utama along 29.3 KM
Condition
Exploration and Geology
Geologically, the coal formations in the area of PT Montalat Jaya Utama are in the Pamaluan Formation and the Berai Formation with the N201°E strike direction with a slope of 9°-12°, the thickness of the coal ranges from 0.5 meters to 3.5 meters.
Coal Condition
Quality varies with Cal values of 3800, 4000, 4200, 4400, 4600, 4800, 5000, and 5700 and consists of 18 seams with varying thicknesses
- Partnership
- Asset and Maintenance Management
- Build, Own, Operate and deliver
- Engineering, Procurement and Construction (EPC)
- Joint ventures
- Managing Contractor
- Operations and Maintenance
- Project Management